Rapid cooling of hot bones trimmings – stage 4

07 June 2024
Focus area: Food safety
Program stream: Growth and global competitiveness
Project number: 2022-1044
This project trialled a nitrogen tunnel freezer at a Queensland-based red meat processing plant to achieve efficient chilling of hot boned beef trim direct from the carcase, prior to packaging. 

As part of the project, the tunnel was tested using different flow rates, nozzle configuration and belt speeds to reach optimal results. 

The tunnel is now in full production and operating as design with desired cooling rates achieved. 
 
Previous in this focus area 31 January 2023 AI computer vision – activity based monitoring across specification, cut and yield Next in this focus area 26 May 2025 Development of a state-of-the-art personal hygiene ante room utilising AI and UV