A purpose-built sterilizer unit was designed by the plant and two prototypes were employed to trial the design.
As part of the project, hot water metering units were installed to accurately measure usage reductions. An immediate flow reduction was evident. There was a 70% water usage reduction on the floor, and it reduced water usage for the whole plant by 18%.